Gloved hands testing a solar module under blue electroluminescence in a dark lab
Home / Quality

Every module ships with its own test record.

Quality is bankability. Under the IEC 62941 quality system, every ems-solar module passes 100% EL imaging and a 100% IV flash test at STC, with results stored against its serial number. The paper trail your financier wants exists before the container door closes.

100%Modules EL-inspected
100%IV flash at STC
0.4%/yrLinear degradation
30 yrPower warranty
4-Stage QC

Four inspection gates before a serial number

Each gate has an owner, a checklist and an escalation path. Pre-shipment inspection is the only gate that can be outsourced — and we encourage it.

IQC — incoming

Cells, glass, encapsulant and frames are sampled against AQL limits on arrival. Rejected lots never reach the line.

IPQC — in-process

Stringer AOI, lamination temperature curves and frame torque are monitored live; deviations stop the line, not the batch.

OQC — outgoing

100% EL imaging, 100% IV flash at STC and visual/AOI checks on every finished module before packaging.

PSI — pre-shipment

Third-party inspection arranged within 3 working days; loading supervised with photo documentation of every pallet.

Reliability Testing

We break modules so your site doesn't

Sample testing follows the IEC 61215 sequence — the same stress tests your certification certificate is built on.

Solar module reliability lab with climate chamber, IV tester and mechanical load rig
Lab · Environment

Climate & IV test benches

Climate chambers cycle modules through temperature and humidity profiles while the IV tester measures power before and after each stress — so degradation shows up as a curve, not a surprise.

Solar module inside an open climate chamber with frost on its glass
Stress · Sequence

Thermal cycling & damp heat

TC200/TC600 thermal cycling between −40 °C and +85 °C, plus DH1000 damp heat at 85 °C / 85% RH, expose solder-joint and encapsulant weaknesses before shipment.

TC600Thermal cycling capability
Mechanical load rig pressing sandbag weights onto a solar module
Mechanical · Load

Snow, wind & hail

Mechanical load testing to 5400 Pa snow / 2400 Pa wind per IEC 61215, plus hail impact at 25 mm / 23 m/s. Bifacial dual-glass builds add a second glass layer for exposed sites.

5400 PaStatic load rating
Test Standards

What each test proves

The full test matrix — standard on every production line, reported per shipment.

TestStandardCoverage
IV flash at STCIEC 61215100% of modules, Pmax stored per serial
EL imagingIEC 61215 / 60904100% of modules — microcrack and cell-finger detection
Visual / AOIIEC 61215100% of modules before packaging
Damp heat (DH1000)IEC 612151000 h at 85 °C / 85% RH, sample basis
Thermal cycling (TC200/TC600)IEC 61215−40 °C to +85 °C, 200/600 cycles, sample basis
UV preconditioningIEC 61215Frontsheet and encapsulant UV resistance
Mechanical loadIEC 612155400 Pa snow / 2400 Pa wind static load
Hail impactIEC 6121525 mm ice ball at 23 m/s
Salt mistIEC 61701Coastal and marine sites (optional)
Ammonia resistanceIEC 62716Farm and livestock environments (optional)
Fire performanceIEC 61730Class A option for rooftop markets
Test report deliveryWithin 48 h of testing, PDF per shipment
Certifications

The certification stack your market requires

Baseline for every export order; market-specific additions on request. Certificate PDFs ship with the datasheet package.

IEC 61215Performance
IEC 61730Safety
CEEU market
UL 61730US/Canada option
ISO 9001Quality system
ISO 14001Environmental
ISO 45001Occupational safety
IEC 62941PV production quality
Flat infographic of the four-stage quality control flow IQC, IPQC, OQC and PSI with icons
Why Certificates Matter

Documents that open doors — and customs

Top-ten makers control ~75% of global shipments, so every other supplier must prove bankability one certificate at a time. Our stack is the export baseline: IEC 61215/61730, CE and ISO 9001/14001/45001, with UL 61730 — the successor to UL 1703 — for US/Canada entry, plus TÜV Rheinland and PVEL as third-party verification partners.

  • IEC 61215 + IEC 61730 — performance and safety qualification
  • UL 61730 — required for US and Canada market entry
  • TÜV / PVEL — independent bankability signals for utility tenders
  • Warranty backing — 15-yr product / 30-yr power, 87.4% at year 30
Aerial view of a bifacial solar farm at sunset
Inspect Before You Pay

Add third-party PSI to any order.

We arrange inspection within 3 working days — and publish the report within 24 h of testing.

Get a Quote →
Get a Quote